New TopShim run:

version = topshim 2.2.0
date = 2024-06-04
time = 18:20:29.909
command = topshim 

FINE SHIMMING

Parameters:

probe = Z163739_0737
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 3.8 Hz, Target= 0.6 Hz, After= 0.7 Hz
Iteration 2: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.7 Hz
Iteration 3: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration 4: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.8 Hz
Iteration 5: FWHM Before= 0.8 Hz, Target= 0.4 Hz, After= 0.7 Hz
Iteration 6: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.7 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D shimming, non-spinning) = 0.726

shim changes: 
Z	-68
Z2	-28
Z3	+17
Z4	-333
Z5	-261
Z6	+138
Z7	+533
Z8	-155

duration = 3 min 19 sec
completed successfully
finished Tue Jun  4 18:23:46 2024


========================================================================